The garage has been quite a project. If you visit us after June 2009,
we should be able to do an oil change! Here are the
specifications for work to be done this
spring.
|
|
|
First of 40 loads of shale fill.
|
|
|
|
The trick to fill is either time (a year or two) or a vibrating roller.
|
|
|
|
Comet, making friends with everyone.
|
|
|
|
One person unloads all of the material.
|
|
|
|
|
|
So that's how one person can unload an entire garage!
|
|
|
|
|
How Hank levels a post.
|
|
|
|
|
|
|
All truses were lifted up by hand!
|
|
|
|
Fog can not stop this crew.
|
|
|
|
This is Janet's favorite picture, as there are two hammars flying.
|
|
|
|
|
Look on the left side of the picture to see how the ceiling was reached.
|
|
|
|
|
Ready for the concrete pour.
|
|
|